Saturday, January 7, 2012
7th January Flyover (Pet Lok Sang Intersection) Project - Completed
Projects information
- Project ៖ 7th January Flyover (Pet Lok Sang Intersection)
- Site Location ៖ Khan Toul Kork and Khan Sen Sok, Phnom Penh
- Project Owner ៖ Phnom Penh Capital Hall
- Contractor ៖ Oversea Cambodian Investment Company (OCIC)
- Specification of the Flyover ៖ This flyover, located along Russian Blvd. connected to Kampuchea Krom Blvd., a concrete type, with 1.08m both sides handle, to be constructed with a park under the bridge.
- Safety Speed ៖ 55 km/h
- Construction Period ៖ 13 months
- Budget ៖ 8.705.808 UDS
/// About the Bridge along Russian Blvd.
- 345m long and 15.2m width
- 2 ways traffic, 2 lanes to come and 2 lanes to go separated by a concrete divider
- Slope of 5.7%
- 9 columns, space from one to another is 20m and 30m
- Safety height under the bridge at the intersection of Road 598, Street 271 and Russian Blvd. is 5.5m
/// About the Bridge along Kampuchea Krom Blvd.
- 160m long and 6.5m width
- One way traffic from the bridge to Kampuchea Krom Blvd. which consists of 1 lane for motorbikes and 1 lane for vehicles.
- Slope 5.7%
- 9 columns, space from one to another is 20m and 30m
- 9 columns, space from one to another is 20m and 30m