Saturday, January 7, 2012

7th January Flyover (Pet Lok Sang Intersection) Project - Completed


Projects information
  • Project ៖ 7th January Flyover (Pet Lok Sang Intersection)
  • Site Location ៖ Khan Toul Kork and Khan Sen Sok, Phnom Penh
  • Project Owner ៖ Phnom Penh Capital Hall

  • Contractor ៖ Oversea Cambodian Investment Company (OCIC)
  • Specification of the Flyover ៖ This flyover, located along Russian Blvd. connected to Kampuchea Krom Blvd., a concrete type, with 1.08m both sides handle, to be constructed with a park under the bridge.
  • Safety Speed ៖ 55 km/h
  • Construction Period ៖ 13 months
  • Budget ៖ 8.705.808 UDS

///  About the Bridge along Russian Blvd.

  • 345m long and 15.2m width
  • 2 ways traffic, 2 lanes to come and 2 lanes to go separated by a concrete divider
  • Slope of 5.7%
  • 9 columns, space from one to another is 20m and 30m
  • Safety height under the bridge at the intersection of Road 598, Street 271 and Russian Blvd. is 5.5m

///  About the Bridge along Kampuchea Krom Blvd.

  • 160m long and 6.5m width
  • One way traffic from the bridge to Kampuchea Krom Blvd. which consists of 1 lane for motorbikes and 1 lane for vehicles.
  • Slope 5.7%
  • 9 columns, space from one to another is 20m and 30m
  • 9 columns, space from one to another is 20m and 30m


People who read this post also read :